Cycle 1: Projects that havenāt yet gotten or used their OP
These are the Phase 0 proposals that were voted in as a batch on June 22.
The full slate is below. Asterisks denote proposals that have not yet gotten or used their granted OP.
These proposals amount to a total of 4.1mm OP in grant funds that have not been deployed as of this writing (11/19).
200k OP for builder grants 100k OP for Optimism-focused events:
Distribution
8/3 Foundation sends 300k OP to multisig 0xcd150D9CFDb39D287D69B9b1bb7111E58414aCA8
Chainlink
Proposal
1mm OP for āNOPs and other ecosystem participants over time in order to support and encourage building on Optimismā
Distribution
8/3 Foundation sends 1mm OP to multisig 0x7EE753e87f20eb3262967c2Fc54762b0B4Ff4D75
0x
Proposal
300k OP to the 0x Grants program for ecosystem builders
Distribution
7/8 Foundation sends 300k OP to multisig 0xba9493f97BEF07a272998139A268398b80AB9Dd5 8/12 0xba9 sends to another multisig, 0x1d702651ed22736eEb261aC9E2B72E7F79Ed9EA9
Zipswap
Proposal
630k OP for gas fee rebates
270k OP liquidity incentivization around planned tokenomics overhaul
Distribution
OP never distributed from Foundation; information and directions were never provided by team.
It appears that this grant wonāt be distributed; Zipswap recently announced plans to cease operations as a team.
Synapse
Proposal
150k OP for builder grants
450k OP for liquidity mining, particularly on stablecoin pool (USDC,DAI,USDT,nUSD)
400k OP for liquidity mining on proposed SYN/Stable Curve pool
Distribution
No distribution has been made by the Foundation to the planned multisig 0x2431CBdc0792F5485c4cb0a9bEf06C4f21541D52.
Connext
Proposal
250k OP for liquidity mining on stable pools
50k OP for gas rebates
Distribution
No distribution has been made by the Foundation to the planned multisig 0x3576aafaffe4c07f894447265b391856377157db.
Gelato
Proposal
250k OP for fee rebates
50k OP for builder bounties
Distribution
7/8 Foundation sends 300k OP to multisig 0x01ea687Be2937D4Bfd9e302b8dbD3be8d9bDb14e.
Observations
This is a lot of undeployed OP (and this is only for one phase), and itās worth checking in with these projects to see what has held them up, whether itās operational issues, market conditions, changes in plans, lack of demand for builder grants, etc.
It could be worth coordinating the release of these lingering incentives at a planned date.
It could also be interesting to see whether these projectsā outlooks or strategies have changed in any way and explore potential changes in scope.
Past a point thereās got to be something like a deadline to start these grants; are we going to honor them if projects donāt claim funds by a year from now, for example?